Confidential
Partnership proposal for landowners25 September 2026

Turning idle industrial land into Europe’s e-truck charging network

VOLTHAUL proposes a long-term ground lease of 5,000–15,000 m² of currently unused surplus land at selected logistics and industrial parks next to motorway exits in Hungary, Austria, Slovakia, the Czech Republic and Romania, for public charging hubs for heavy-duty electric trucks.

25years

Lease term

€0.40/ m² / month

Ground rent

5–15km²

Per site

~4MW

Grid connection per site

7 + 3sites

Priority hubs + alternates across 5 countries

Our vision

Powering the electric corridors of Central Europe.

We are building a network of public charging hubs for heavy-duty trucks along the region’s busiest freight routes — from the German border to Budapest and Bucharest, from Prague to Košice. Our aim is simple: an electric truck should be able to cross Central Europe as reliably as a diesel one does today, charging during the driver’s mandatory break. This is not a distant ambition. The trucks are on the road, the regulation is in force, and the first corridors are being built now. The missing piece is the right land, at the right motorway exits — and that is where the right landowner comes in.

Aerial visualisation of a solar-canopied electric truck charging hub beside a logistics park, with white trucks, driver lounge and transformer building
Illustrative visualisation — typical VOLTHAUL hub on surplus logistics-park land

One framework.
A scalable network.

VOLTHAUL Kft. (or a dedicated SPV designated by VOLTHAUL) leases surplus land from the park owner under one framework agreement, with individual sites drawn down by call-off. VOLTHAUL develops, permits and delivers each site and holds the right to sublease or assign the site to an operating partner who will run the charging hub. The landowner deals with one counterparty and one set of terms across the whole network.

01

Framework agreement with the landowner

02

Site call-off, permitting and grid connection

By VOLTHAUL, at VOLTHAUL’s cost

03

Hub operated by VOLTHAUL or its operating partner

Ground-level visualisation of navy and green drive-through megawatt charging portals with a white electric truck in the middle bay
Illustrative visualisation — megawatt charging bays for heavy-duty trucks

Value without
capital at risk.

Convert non-core land into long-duration income while adding mission-critical infrastructure for park tenants.

01

New income

From land that currently earns nothing.

02

Zero capex. Zero development risk.

Permitting, grid connection and construction are carried by VOLTHAUL or its partner.

03

Long-duration value

25-year, index-linked income that adds value to the park at exit.

04

A service for park tenants

Their e-truck fleets can charge at the gate—supporting Scope 3 and ESG targets.

05

Future-proofed parks

Infrastructure aligned with EU AFIR requirements and the electrification of road freight.

06

Simple execution

One framework, one counterparty, multi-country rollout.

Clear, repeatable
commercial terms.

A master structure designed to accelerate site activation while protecting both parties through site-specific conditions precedent.

Tenant
VOLTHAUL Kft. (Hungary) or an SPV designated by VOLTHAUL
Premises
5,000–15,000 m² per site (depending on location), surplus land with direct truck access, ideally outside the park fence
Term
25 years from signing of each site lease, with extension options
Rent
€0.40 per m² per month, net, indexed annually (index to be agreed)
Rent-free period
No rent is payable until the final, unappealable building permit is obtained for the site
Pre-development
VOLTHAUL / its partner prepares and pays for all studies, permitting and the grid connection application
Right to sublease / assign
The tenant may sublease or assign each site, in whole, to its operating partner without further consent
Site selection
Sites are called off only after technical and commercial approval by the operating partner
Conditions precedent per site
Grid connection offer (~4 MW), building permit, operating partner commitment
Access
24/7 public access for trucks, ideally a dedicated access road separated from park circulation

A dedicated platform
for the network.

VOLTHAUL Kft. is a Hungarian company set up specifically to develop and operate the charging hub network. Sites are held through one SPV per country (per-site SPVs possible later), and subleased or assigned to the operating partner.

K Fundacja Rodzinna

VOLTHAUL Kft.

Hungary · developer and tenant

Country SPV holdings

one SPV per country at launch; per-site SPVs possible later

Ground leases with landowners

25 years · framework + call-offs

Operating partner

sublease / assignment per site

Shareholder structure to be finalised.

Built around the
driver’s break.

Range, working-time rules and European infrastructure policy converge around a clear corridor strategy.

350–450km practical range

New long-haul e-trucks are rated at 500–720 km; loaded winter operation brings practical range closer to 350–450 km.

45minute break

An EU truck driver must stop after 4.5 hours of driving—approximately 350 km—the natural megawatt-charging window.

60–120km AFIR spacing

Public HDV charging pools every 120 km on 50% of TEN-T by end-2027 and every 60 km on the core network by 2030.

Target corridor spacing150–250 km

Close enough to give drivers a fallback, far enough that every hub serves a full break cycle.

Corridors served

Rhine–Danube Vienna–Budapest–Arad

Orient / East-Med Dresden–Prague–Brno–Bratislava–Budapest

Baltic–Adriatic Poland–Brno–Vienna

Slovak D1 Bratislava–Žilina

Pan-European Corridor IV (RO A1) Nădlac–Arad

Ten locations.
Five markets.

Seven priority locations establish the first connected corridors. Three alternates create resilience and infill optionality. Final site selection happens together with each landowner.

Loading network map…
Priority hub Alternate / infill Priority corridor leg

Indicative locations identified by VOLTHAUL desktop analysis (September 2026). Road distances computed on OpenStreetMap routing and to be verified on site. Surplus land, site areas and grid capacity to be confirmed with each landowner.

The proposal
at a glance.

Preview all three A4 pages before downloading the PDF.

From concept to
first call-offs.

A focused management process can move the priority network into diligence quickly, beginning in Hungary.

  1. 01

    Meeting with the landowner

    Agree the concept and headline terms

  2. 02

    The landowner shares priority-site data

    Surplus-land plans and grid information

  3. 03

    Framework agreement and first call-offs

    Hungary first

  4. 04

    Permitting and grid connection

    Rent starts from final building permit

Ready to define the
first priority sites.

VOLTHAUL Kft.

02

Dr. Orly Paran, Adv. (Isr.)

Business Development Hungary
VOLTHAUL Kft.

+36 20 582 1887